2022 Sewer Extension Survey Results
Below are links to documents prepared for the sewer extension survey conducted at three Avon neighborhoods in February and March 2022. Although the surveys were conducted simultaneously, the results are reviewed, and potential projects are being considered independently. Based on the results and the relative participation and subsequent reinforcement provided by residents, the Timber Lane area became the first priority project to pursue.
Updates as of March 30, 2022
- Sewer Extension: Questions and Answers - March 30, 2022
- Sewer Survey Update Letter - March 21, 2022
- Sewer Extension Survey Results Summary Table
- Carriage Drive Area Neighborhood Consensus
- Stony Corner Neighborhood Consensus
- Timber Lane Neighborhood Consensus