Timber Lane Sewer Extension Project

Notice of Special Benefit Assessments and Appeal Due Date -- February 2024

Notice Letter

 

Timber Lane Sewer Update -- October 2023

After several challenges with the project and the contractor, the project is back in order and under way.  Several weeks ago, the contractor hit ledge rock while excavating for the mainline.  This caused us to redesign the last run of the sewer since we had limited options.  We were able to complete the redesign and secure the needed parts and supplies such that the contractor can complete the installation of the mainline and the remaining lateral stubs.  Once these items are completed, we will bring in a paving contractor to complete the road, driveway, and curbing repairs.  When these are completed, the contractor will complete this stage of the shoulder restoration.  Given the time of year, we do not expect grass to begin germinating, so we anticipate re-seeding disturbed lawn areas in the Springtime.  We want to thank all of the residents affected for their patience and understanding during this project.

Timber Lane Sewer Update -- August 2023

On August 8, 2023, an email went out to the benefiting residents of the Timber Lane Sewer Extension Project.
 

Timber Lane Sewer Update -- March 2023

At its March 16, 2023 meeting, the AWPCA will be presenting the results of the bidding process for the Timber Lane sewer extension project. Interested residents are encouraged to attend to learn more about the project costs and other relevant information.  A copy of the presentation is included here: Timber Lane Presentation

Timber Lane Sewer Update – October 2022

At its regularly scheduled meeting on October 13, 2022, the AWPCA voted to proceed with the design for the proposed sewer extension project with a goal of bidding the project over the winter of 2022-2023 and constructing it in 2023. 

Timber Lane Sewer Update, September 2022

At its regularly scheduled meeting on September 15, 2022, the AWPCA held a public information meeting in which the Town Engineer presented the preliminary design, cost estimates, and potential benefit assessment information  for the Timber Lane sewer extension project.  Letters were mailed to each of the ten potentially benefiting residents in advance of the meeting inviting them to attend the meeting and to contact the Avon Engineering Department with questions. 

A copy of the presentation is included here: Timber Lane Presentation